翻訳と辞書
Words near each other
・ Erebia pharte
・ Erebia polaris
・ Erebia rondoui
・ Erebia rossii
・ Erebia sthennyo
・ Erebia tyndarus
・ Erdgeist
・ Erdheim–Chester disease
・ Erdhenne
・ Erdi
・ Erdi Öner
・ Erdin Demir
・ Erding
・ Erding (district)
・ Erding Air Base
Erding Ring Closure
・ Erdinger
・ Erdington
・ Erdington Abbey
・ Erdington railway station
・ Erdini
・ Erdinç
・ Erdinç Balto
・ Erdinç Saçan
・ Erdinç Tekir
・ Erdinç Türksever
・ Erdinç Yavuz
・ Erditse
・ ERDL pattern
・ ERDLator


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Erding Ring Closure : ウィキペディア英語版
Erding Ring Closure

|}
The Erding ring closure ((ドイツ語:Erdinger Ringschluss)) is a project involving the building of a 30.2 km long, double-track railway that is planned to run from Freising via Munich Airport to Erding.
==Route==

Line 5559 would run from Freising station as a four-track line together with line 5500 (the Munich–Regensburg railway) to Neufahrn North junction (''Abzweig Neufahrn-Nord''). It would run over the "Neufahrn counter curve" (''Neufahrner Gegenkurve'') to reach line 5557 (the Neufahrn Link) at Neufahrn East junction (''Abzweig Neufahrn-Ost'') and connect with line 5556 (Munich East–Munich Airport railway) at Airport West junction (''Abzweig Flughafen-West''). From there the existing double-track line would be shared through the airport. The route from Freising to Munich Airport is 16.3 km long.
The route would continue under the eastern apron of Munich Airport in a tunnel until it resurfaces near Schwaigerloh. It would then run above ground to Erding. In the Schweigerloh area it is intended to build a system for turning trains, so trains coming from Regensburg or Landshut to stop at the airport could be reversed.
After another 13.2 km a junction station would be built on the grounds of the Erding Air Base that can accommodate both Munich S-Bahn trains and regional trains from the southeast using the “Walpertskirchen clasp” (''Walpertskirchener Spange''). The current station in the centre of Erding, which is 700 metres away, would then be closed. Trains would continue towards Munich on the existing Markt Schwaben–Erding railway. The section between the Altenerding station and the current Erding Station would be tunneled or lowered in order to avoid congestion at two level crossings (Haager Straße and Dorfener Straße). The resulting open space is planned to be redeveloped as residential and green areas.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Erding Ring Closure」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.